The process and whats included in your above ground pool installation.
- Arrive at your house on time and meet you, the pool owner.
- Find out exactly where you want the pool and then paint out the site.
- Bring the equipment, tools, supplies, and pool to your back yard.
- Use a sod cutter machine to cut out the sod of the install site.
- Use a Bobcat to remove the sod and level the earth on the install site.
- Use the Bobcat to place the sod and excess earth anywhere you want in your yard.
- Continue to level the site using the Bobcat and a builder's level.
- Set out the pool's bottom frame. Assemble the frame and shape it with a tape measure.
- Level the bottom frame with cement blocks using the builder's level to within one half inch.
- Roll out the pool wall and place it in the bottom frame and connect the uprights.
- Connect the wall at its ends, tape the bolts on the inside.
- Using ground tools, create the cove and level and smooth out the pool's earth bottom.
- Apply nut grass killer, then start unfolding the liner and set it in place.
- Finish setting the liner and secure it to the top of the pool wall by the pool model's design.
- Set the liner to its final place working out any wrinkles while pumping in approx. 500 gallons of water.
- Complete the installation of the pool's top frame.
- Cut in and install the pool's skimmer and return fitting.
- Assemble the pool's equipment and attach it to the skimmer and return.
- Continue filling the pool while cleaning up the area and loading up the equipment and tools.
- Your pool is complete and filling and the pool's equipment is ready for electric.