The process and whats included in your above ground pool installation.

  1. Arrive at your house on time and meet you, the pool owner.
  2. Find out exactly where you want the pool and then paint out the site.
  3. Bring the equipment, tools, supplies, and pool to your back yard.
  4. Use a sod cutter machine to cut out the sod of the install site.
  5. Use a Bobcat to remove the sod and level the earth on the install site.
  6. Use the Bobcat to place the sod and excess earth anywhere you want in your yard.
  7. Continue to level the site using the Bobcat and a builder's level.
  8. Set out the pool's bottom frame. Assemble the frame and shape it with a tape measure.
  9. Level the bottom frame with cement blocks using the builder's level to within one half inch.
  10. Roll out the pool wall and place it in the bottom frame and connect the uprights.
  11. Connect the wall at its ends, tape the bolts on the inside.
  12. Using ground tools, create the cove and level and smooth out the pool's earth bottom.
  13. Apply nut grass killer, then start unfolding the liner and set it in place.
  14. Finish setting the liner and secure it to the top of the pool wall by the pool model's design.
  15. Set the liner to its final place working out any wrinkles while pumping in approx. 500 gallons of water.
  16. Complete the installation of the pool's top frame.
  17. Cut in and install the pool's skimmer and return fitting.
  18. Assemble the pool's equipment and attach it to the skimmer and return.
  19. Continue filling the pool while cleaning up the area and loading up the equipment and tools.
  20. Your pool is complete and filling and the pool's equipment is ready for electric.